Here’s a confession. The most expensive words in any kitchen renovation aren’t “marble” or “butler’s pantry”. They’re “oh, we haven’t decided that yet.”
I’ve watched it happen more times than I’d like. A tradie turns up on Monday, the old kitchen is half out the door, and someone asks, “So, where did you want the power points?” Silence. Then a very long phone call to a partner. Meanwhile the clock (and the invoice) keeps running.
That’s why this kitchen renovation checklist exists. It covers everything you should decide before the first cabinet comes off the wall. Do the thinking now, on your couch, with a cuppa, and the building part gets calmer, cheaper and a lot less sweary.
At Modern View Constructions we put our clients through a version of this list before any quote gets signed. Grab a notepad. Let’s go.
Why a Kitchen Renovation Checklist Saves You Money
A kitchen is the hardest room in the house to get right. It has plumbing, electrics, ventilation, storage, heavy appliances and about forty-seven things you touch every day. Change your mind halfway through and you don’t just move a wall. You can wreck the order of every trade who follows.
A good kitchen renovation checklist does three things:
- It stops budget blowouts. Late changes are the number one cause of cost creep.
- It keeps trades in the right order. Plumber, electrician, cabinet maker, stone mason, painter. Miss a step and everyone waits.
- It keeps you sane. You’ll still have a washing-up-in-the-bathroom phase. But it’ll be a short one.
Think of it like packing for a trip. Throw things in the night before and you’ll forget your charger. Plan it a week out and you’re laughing.
Step 1: Set a Realistic Kitchen Renovation Budget
Money first. Always. Not the fun stuff.
Costs vary a lot across Australia. Sydney and Melbourne tend to sit higher than regional areas, and the size of your kitchen, the finishes and what’s hiding behind your walls all matter. As a rough guide only, here’s how kitchen renovations commonly fall:
| Level | Typical Range (AUD) | What You Usually Get |
| Cosmetic refresh | $8,000 – $20,000 | New doors, benchtop, splashback, tapware, paint. Same layout. |
| Mid-range renovation | $20,000 – $45,000 | New cabinets, stone or similar benchtop, new appliances, some layout tweaks. |
| High-end / full custom | $45,000 – $80,000+ | Custom joinery, premium appliances, layout changes, structural work. |
These are ballpark figures to help you plan, not a quote. Get written quotes for your own home.
Add a Buffer (Please)
Always set aside 10% to 20% on top for surprises. Old homes especially love to surprise you. Rotten subfloor, dodgy wiring, a pipe that goes somewhere pipes shouldn’t. Hardly anyone regrets having a buffer. Plenty regret skipping one.
Where the Money Usually Goes
Roughly speaking, here’s how a kitchen budget tends to split:
- Cabinetry and joinery: the biggest slice
- Appliances: a big chunk, and very easy to overspend on
- Labour and trades: plumbing, electrical, tiling, painting
- Benchtops and splashback
- Flooring, lighting, tapware and handles
Handles. Yes, really. I once saw someone pick $38-a-piece handles for 30 doors. Lovely handles. Terrible surprise.
Step 2: Decide What the Kitchen Needs to Do
Before you pin a single Pinterest photo, ask: how do you actually use this room?
- Do you cook every night, or mostly reheat and assemble?
- Is it just you, or a family of five with a dog underfoot?
- Do you entertain? Do guests end up around the bench no matter how nice your lounge is? (They always do.)
- Do you need a homework spot, a coffee corner or a pantry for bulk buying?
Write down your three biggest annoyances with the current kitchen. Mine would be “nowhere to put the bin”, “bench too narrow” and “can’t open the dishwasher and fridge at the same time”. Those three complaints should shape the design more than any trend ever will.
Step 3: Choose Your Layout
The layout is the skeleton. Get it right and everything else is just dressing.
| Layout | Best For | Watch Out For |
| Galley | Small or narrow spaces | Can feel tight with two cooks |
| L-shape | Most medium kitchens, open-plan homes | Corner storage needs clever fittings |
| U-shape | Lots of bench and storage | Needs enough floor space to avoid feeling boxed in |
| Island or peninsula | Bigger rooms, entertaining | Needs good clearance around it, and a plan for power and plumbing |
The Work Triangle (Still Useful)
Keep the sink, cooktop and fridge in a loose triangle, close enough to be handy but not so close you’re tripping over each other. As a general rule, aim for around 1 metre or more of clear walkway beside benches, and more if two people cook together.
Moving Things Costs More
Here’s a handy truth. Keeping the sink and gas or electrical points where they are is cheaper. Moving them means opening floors and walls. If your budget is tight, keep the “wet” areas put and spend on finishes instead.
Step 4: Know What Needs Approval and a Licensed Trade
This is the boring bit that stops you getting burned later.
In Australia, plumbing, electrical and gas work must be done by licensed tradespeople. No exceptions, and no mate-of-a-mate doing it “just this once”. Depending on your state or territory and the scale of your project, you might also need council approval or a building permit, especially if you’re removing walls, changing the structure or altering the footprint.
Rules differ between states, so check with your local authority. Good starting points:
- Australian Building Codes Board for national building code information
- Your state’s building regulator, such as the Victorian Building Authority or NSW Fair Trading
Also ask your builder to confirm they hold the right licence and home warranty insurance where required. It takes two minutes and it can save you a world of pain.
A Quick Word on Asbestos
If your home was built before the late 1980s, there’s a real chance of asbestos in wall sheeting, splashbacks, vinyl flooring or under old tiles. Get it tested before demolition. Never DIY-smash a wall in an older home and hope for the best.
Step 5: Pick Your Cabinetry and Storage
Cabinets are where most of your money lives, so slow down here.
Cabinet Options at a Glance
| Type | Pros | Cons |
| Flat-pack | Cheapest, quick | Limited sizes, quality varies |
| Pre-made / modular | Good middle ground, decent range | Less flexible with odd spaces |
| Custom-made | Fits perfectly, endless finishes | Highest cost, longer wait |
Think About Storage, Not Just Looks
Deep drawers beat doors for pots and pans. Pull-out pantries beat deep dark cupboards where tins go to die. Plan a spot for:
- A bin system (two or three bins, sorted for recycling)
- Appliances you use daily, like the kettle and toaster
- Awkward items such as baking trays and chopping boards
- Bulk pantry goods
Lead times matter too. Custom cabinetry can take 6 to 12 weeks from order to delivery, sometimes longer in busy periods. Order late and you’ll be cooking on a camp stove.
Step 6: Choose Benchtops (and Know the Engineered Stone Ban)
Your benchtop takes a beating, so pick for life, not just looks.
| Material | Look and Feel | Notes |
| Laminate | Budget-friendly, lots of designs | Can chip or scorch, not repairable |
| Natural stone (granite, marble) | Classic, premium | Marble stains and etches, needs sealing |
| Porcelain / sintered | Hard-wearing, heat-resistant | Needs skilled installers, edges can be pricey |
| Solid surface | Seamless, repairable | Can scratch, less heat-tolerant |
| Timber | Warm and natural | Needs regular oiling, water care |
One important update. Engineered stone (the quartz-style benchtops many of us grew up lusting after) has been banned across Australia for manufacture, supply and installation since 1 July 2024, due to the silica dust risk to workers. So don’t be surprised if a supplier steers you towards other materials. If you’ve seen an old quote or magazine that mentions it, that info is out of date.
Pick your benchtop before you finalise the cabinet drawings. The stone mason measures only after cabinets are in, and that sequence affects your timeline.
Step 7: Plan Appliances Early
Appliances look simple. They are not. Size, power and ventilation all matter.
Decide on these before your cabinet maker starts drawing:
- Cooktop: gas, induction or electric? Many Aussies are moving to induction. It’s fast, easy to clean and efficient. Gas needs a licensed gasfitter and good ventilation.
- Oven: under-bench or wall oven? Steam function? Do you actually use it?
- Rangehood: ducted outside is better than recirculating if you can manage it.
- Dishwasher: one or two drawer-style? Standard?
- Fridge: measure the space and the doorway it needs to pass through. I’ve seen a gorgeous fridge sit in the driveway for a fortnight.
Buy (or at least choose) appliances before cabinetry is built. You’ll get exact dimensions, which saves awkward gaps and rework. Also check the energy ratings through the government’s Energy Rating site. A more efficient appliance can save real money over a decade.
Step 8: Sort Lighting, Power and Plumbing
Lighting is the quiet hero of a good kitchen. Layer it:
- Ambient: your main ceiling lights
- Task: under-cabinet lights over the bench where you chop
- Feature: pendants over an island or a little accent glow
Then plan your power points. More than you think. Seriously. Benchtop appliances, phone chargers, a coffee machine, the air fryer you swore you wouldn’t buy. Ask your electrician to mark positions on the wall before cabinets go in. A few USB-ready outlets are handy, too.
For plumbing, decide your sink style (single, double, farmhouse), tapware finish and whether you want a filtered water tap or an instant boiling unit. Each one needs its own plumbing and, often, a power point under the sink.
Step 9: Choose Splashback, Flooring and Finishes
Now the pretty stuff. Finally.
Splashback
Tiles, glass, stone slab or stainless steel. Large-format tiles mean fewer grout lines, which means less scrubbing. Your future self will say thank you.
Flooring
Keep it tough and water-friendly. Porcelain tile, sealed timber, quality vinyl planks and polished concrete all work. Soft carpet in a kitchen is a no from me.
Colours and Trends Worth Knowing
Right now, Aussie kitchens lean toward:
- Warm, earthy tones (think clay, sage and oatmeal) over stark white
- Textured finishes and fluted or ribbed panels
- Matte black or brushed brass tapware
- Integrated appliances that vanish behind panels
- Hidden “scullery” or butler’s pantry spaces
Trends are fun, but they age. A good rule: keep the big, expensive stuff (cabinets, benchtops) timeless, and let the cheap stuff (handles, paint, lighting) carry the trend. Easy to swap in five years.
Step 10: Plan the Timeline (and Your Temporary Kitchen)
A typical kitchen renovation often runs 4 to 8 weeks on site, but that’s after the design, approvals and ordering are done. Add planning and lead times and the full journey can be 3 to 6 months.
Here’s the usual order of play:
| Stage | What Happens |
| 1. Design and quotes | Layout, finishes, budget locked in |
| 2. Approvals and orders | Permits if needed, cabinets and appliances ordered |
| 3. Demolition | Old kitchen out, asbestos checks done first |
| 4. Rough-in | Plumbing, electrical and any structural work |
| 5. Walls, ceiling, flooring prep | Plastering, sheeting, waterproofing where needed |
| 6. Cabinet installation | The big moment |
| 7. Benchtops, splashback | Templating, then install |
| 8. Final fit-off | Plumber, electrician, appliances, painting |
| 9. Clean-up and sign-off | Final checks and handover |
Your Temporary Kitchen
Don’t skip this. Set up a little zone with a kettle, microwave, bar fridge and a tub for washing up. Stock the freezer with easy meals. Budget for some takeaway. Honestly, it’s part of the experience.
Step 11: Choose the Right Builder
Cheap quotes can get expensive fast. When comparing builders, don’t just look at the bottom line.
Ask:
- Are quotes itemised, so you can compare apples with apples?
- Do they hold the right licence and insurance?
- Can you see recent kitchen projects and speak to past clients?
- How do they handle variations (changes) and extra costs?
- Who is your point of contact during the job?
Get at least three quotes if you can. And trust your gut. If someone’s vague about price or pushes you to sign today, walk away.
Your Printable Kitchen Renovation Checklist
Here it is, boiled down. Tick these off before demolition day:
Planning
- [ ] Budget set, with a 10–20% buffer
- [ ] Main annoyances with the current kitchen listed
- [ ] Layout chosen
- [ ] Approvals checked with council or your state regulator
- [ ] Asbestos checked (older homes)
Design choices
- [ ] Cabinet style, colour and hardware picked
- [ ] Benchtop material picked
- [ ] Splashback and flooring picked
- [ ] Tapware and sink picked
- [ ] Lighting plan done
- [ ] Power point positions marked
Appliances
- [ ] Cooktop, oven, rangehood, dishwasher and fridge chosen
- [ ] Exact dimensions and power or gas needs confirmed
Logistics
- [ ] Builder and licensed trades locked in with a written contract
- [ ] Timeline agreed
- [ ] Orders placed with lead times checked
- [ ] Temporary kitchen set up
Common Kitchen Renovation Mistakes to Avoid
A few classics I see again and again:
- Choosing finishes before the budget. The marble dream meets the bank balance.
- Forgetting the buffer. Surprises happen. They always do.
- Ignoring storage. A pretty kitchen you can’t store anything in is just a nice room.
- Skipping the mock-up. Tape the layout on the floor. Stand in it. Pretend to cook.
- Leaving decisions until the last minute. Remember that opening line.
Final Thoughts: Plan Now, Cook Happy Later
A great kitchen isn’t built in the demolition. It’s built in the decisions you make before it. Work through this kitchen renovation checklist, lock in your budget, layout, materials and trades, and the actual build becomes the easy part.
If you’d like a hand turning that list into a real plan, the team at Modern View Constructions is happy to chat. Get in touch for a free consultation, bring your notepad (and your list of kitchen gripes), and we’ll help you build a kitchen you’ll actually love cooking in.
Ready to start? Contact Modern View Constructions today and let’s get your kitchen renovation moving.
FAQs
How much does a kitchen renovation cost in Australia? It depends on size, finishes and layout changes. As a rough guide, a cosmetic refresh may start around $8,000, mid-range renovations often sit between $20,000 and $45,000, and high-end custom kitchens can go beyond $60,000. Always get written quotes for your own home.
How long does a kitchen renovation take? On site, usually 4 to 8 weeks. With design, approvals and cabinet lead times, plan for 3 to 6 months from start to finish.
Do I need council approval for a kitchen renovation? Not always. A like-for-like refresh often doesn’t, but removing walls, changing structure or altering the footprint usually does. Check with your local council or state building regulator.
What should I decide first when renovating a kitchen? Your budget, then your layout. Those two choices shape everything that follows.
Can I live at home during a kitchen renovation? Yes, many people do. Set up a temporary kitchen with a kettle, microwave, bar fridge and washing-up tub, and expect some noise and dust.
What order should a kitchen renovation happen in? Design and quotes, approvals and orders, demolition, plumbing and electrical rough-in, wall and floor prep, cabinets, benchtops and splashback, final fit-off, then clean-up.